Fully Loaded Interior

Fully Loaded Interior

 

  1. Removing the entire existing interior.
  2. Making the provision to Install the roof Mounted Bus Air Conditioner system with proper Mounting Bolt & roof cutting for supply & suction of the Air..
  3. Insulating the entire bus Roof with 13mm thick Nitrile Rubber & High Density Thermacool and covering the same with Ply & sheet as required.
  4. Removing the entire side panel under the glass.
  5. Insulating the entire side panel with 13mm thick Nitrile Rubber & High Density Thermacool and covering the same with ACP / WCP/ABS.
  6. Preparing a Drive cabin partition with proper structure support & it is insulated with High Dencity Thermocol & Cover with ACP & proper glass partition & door latches.
  7. Making a New Ducting with hatrack by which the Bus should look wider from inside with individual louver on each seat, full upholstery including driver cabin partition with Fabric & leatherette.
  8. AC Ducting in the driver cabin area with a louver of cool air on the driver head & giving proper space for keeping the papers & valuable with lock and key.
  9. All new LED Lights inside the Bus & Drive cabin Area.
Scroll Up